Reference boundary

BC Hydro source-navigation only. It does not publish metering configurations, socket diagrams, dimensions, service values, tariff terms, or utility acceptance wording.

Reference table

Point to BC Hydro public source pages relevant to secondary voltage revenue metering review.

Reference basis uses BC Hydro Distribution Technical Standards and Guides, Secondary Voltage Revenue Metering May 2026, and accepted meter sockets dated June 1, 2026.
Source areaCurrent sourceReview useBoundary
Distribution standardsBC Hydro Distribution Technical Standards and GuidesUse this hub to locate the current BC Hydro revenue-metering source list.source-navigation only; no configuration, socket diagram, dimension, service value, or acceptance wording is reproduced
Secondary Voltage Revenue MeteringSecondary Voltage Revenue Metering, May 2026Use this current BC Hydro PDF before any secondary metering review.source-navigation only; no metering layout, requirement, value, or drawing is reproduced
Accepted meter socketsAccepted meter sockets list, June 1, 2026Use this official socket-list source as the current device-list entry point.source-navigation only; no socket list, approval result, or suitability decision is reproduced
Electric TariffBC Hydro Electric Tariff and related metering contextUse tariff and advisory links for governing context before project review.source-navigation only; no tariff term, metering decision, or service acceptance is reproduced
Use notes
  • Use this table only for source-navigation and current source-area review.
  • Confirm the current source document, product marking, utility page, or authority guidance before any design or field decision.